Nashville, TN · Local contractor rules
Contractor license requirements in Nashville, Tennessee
What Nashville requires before you work there, on top of Tennessee state licensing. Checked November 6, 2026 from 13 official sources.
Do I need a Nashville license to work there?
Only for some trades: Electrician, plumber and HVAC contractor.
Metro Nashville-Davidson County requires every contractor who pulls a building permit to have a Davidson County business license (or an exemption affidavit), a Metro permit bond of $10,000 or $40,000, and proof of workers' compensation (or an exemption affidavit).2
Nashville has 2 license types. You need only the one that fits your work:
Registration as a State Trades Contractor For: Electrician, plumber, HVAC contractor Fee$150Bond$40,000 Metro trade certificate and Registered Metropolitan Trades Contractor (master electrician, equipment installer, low voltage, master plumber, septic tank and overflow, master mechanical, HVAC&R, gas and appliance) For: Electrician, plumber, HVAC contractor Fee$50Bond$40,000This is on top of the Tennessee state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need a Tennessee state license and which Nashville license is yours. Open a row for the full checklist.
Other contractors need no Metro trade certificate, but to pull a building permit they must provide a Davidson County business license or exemption affidavit, a Metro permit bond ($10,000 for contracts or bids under $25,000, $40,000 for $25,000 and over), proof of workers' compensation or an exemption affidavit, and any state license the job needs.2
More
Blasting contractors also need at least $10,000/$300,000 of blasting liability insurance, and house moving contractors need a $40,000 bond.
How to start working in Nashville
- 1
Get your Tennessee license if your trade needs one
Tennessee licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
Get a surety bond
$40,000Every Nashville license type needs a $40,000 bond.4 You pay a yearly premium to a surety company, not the full amount. Estimate the cost
- 3
Get a certificate of insurance
The minimums depend on which license you get. They are listed in each license below.
- 4
Apply for your Nashville license
Apply for the one that fits your work, with Metropolitan Government of Nashville and Davidson County, Department of Codes and Building Safety.
- Registration as a State Trades Contractor$150
- Metro trade certificate and Registered Metropolitan Trades Contractor (master electrician, equipment installer, low voltage, master plumber, septic tank and overflow, master mechanical, HVAC&R, gas and appliance)$50
- 5
Business license or tax registration
A Davidson County business license, from the Davidson County Clerk, is required to get a building permit if the business is located in Davidson County, is located outside Tennessee, or is located elsewhere in Tennessee and does more than $100,000 (bid price) of work in Davidson County in a taxable year. Otherwise the contractor signs an exemption affidavit.2
- 6
Pull a permit for each job
Contractors who are licensed and bonded with Metro Codes may obtain building permits within their license limits.1101112
More
Registered contractors can apply for residential building permits and trade permits on ePermits; only registered licensed contractors can have an online account. Electrical, plumbing and gas/mechanical work need separate permits, issued to licensed subcontractors after the building permit. Others apply in person at the Department of Codes and Building Safety.
Details for each Nashville license type
You need only one of these: the one that fits your work.
Registration as a State Trades Contractor ElectricianPlumberHVAC contractor Fee$150 Bond$40,000
Who needs it
Holders of a Tennessee contractor license who want to obtain trade permits in Nashville and Davidson County.4
More
Gas/mechanical needs state classification CMC-C or CMC, plumbing needs CMC-A or CMC, and electrical needs CE, CE-B or CE-H.
What you need
The person who passed the state exam fills out the registration form, with an affidavit from the State of Tennessee naming the company's qualifying agent.4
More
A sole proprietor, partner or corporate officer also signs, and the form is notarized.
Attach a copy of the state license showing number, limit and classifications, the bond, the insurance certificate and the Davidson County business license.4
More
The bond, insurance and business license must be in the exact name on the state license.
Permits must be signed by the person who passed the state exam.4
Fees and bond
A $40,000 Metropolitan permit bond on the Metro form, signed, notarized and sealed, with the surety's power of attorney.
Insurance
General liability insurance of at least $300,000, with the Metropolitan Government of Nashville and Davidson County as certificate holder.4
Metro trade certificate and Registered Metropolitan Trades Contractor (master electrician, equipment installer, low voltage, master plumber, septic tank and overflow, master mechanical, HVAC&R, gas and appliance) ElectricianPlumberHVAC contractor Fee$50 Bond$40,000
Who needs it
What you need
Experience for the Metro exams: master electrician 6 years; equipment installer I (residential electrical appliance installation), equipment installer II (electrical signs) and low voltage installer 3 years each; master mechanical 6 years; HVAC&R 4 years; gas and appliance 3 years. An engineering degree may be accepted instead of experience.678
A master plumber applicant must have held a Davidson County journeyman plumber license for 6 months.9
More
Master plumber candidates also take the septic tank and overflow exam.
For the electrical exams, the Chief Electrical Inspector reviews the application, then the applicant schedules the exam with Prov.6
More
The passing grade is 70%, and a failed candidate may apply to retest after 30 days.
To register, the firm sends the notarized registration form with the bond, insurance certificate and Davidson County business license. The firm certifies that the certificate holder is employed full time.5
Fees and bond
A $40,000 Metropolitan permit bond, signed, notarized and sealed, with the surety's power of attorney.
Insurance
General liability insurance of at least $300,000, with the Metropolitan Government as certificate holder.5
The Metro Board of Mechanical, Plumbing, and Electrical Examiners and Appeals examines and issues Metro certificates for master mechanical, HVAC&R, gas and appliance, master, journeyman and apprentice plumber, master electrician, equipment installer and low-voltage wiring installer.3
To pull electrical, plumbing or gas/mechanical permits, a trade contractor must register with Metro Codes, either as a state-licensed trades contractor or as a holder of a Metro trade certificate.45
More
Both registrations need a $40,000 Metro permit bond, $300,000 of general liability insurance and a Davidson County business license.
For homeowners
Can I do the work and pull the permit myself?
A property owner who occupies or intends to occupy a single-family residence may get a building permit (a self permit) to build or repair it.101213
More
The owner signs a notarized affidavit saying the permit is not for a contractor, no permit for a duplex or single residence was issued or applied for in the last two years, and the work is not a home or addition of $25,000 or more for resale, lease or rent. The owner becomes fully responsible for code compliance and loses the protection of the contractor's permit bond. Homeowners must apply in person. Trade permits are usually issued to licensed subcontractors, but in certain cases may be issued directly to the homeowner.
Check a contractor before you hire
Nashville requires contractors to hold one of the local licenses above and a bond and insurance. Ask for a copy of each.
Good to know
The Metro Board of Mechanical, Plumbing, and Electrical Examiners and Appeals also examines applicants for homeowner permits.3
Common questions
Do I need a contractor license to work in Nashville?
Only for some trades: electrician, plumber and HVAC contractor. Other trades need no Nashville license, only any Tennessee license the trade requires.
How much does a Nashville contractor license cost?
It depends on the license type. Registration as a State Trades Contractor: $150 (electrical registration). Metro trade certificate and Registered Metropolitan Trades Contractor (master electrician, equipment installer, low voltage, master plumber, septic tank and overflow, master mechanical, HVAC&R, gas and appliance): $50 (gas and appliance exam).
Do Nashville contractors need a bond?
Yes, and the amount depends on the license type. Registration as a State Trades Contractor: $40,000 bond. Metro trade certificate and Registered Metropolitan Trades Contractor (master electrician, equipment installer, low voltage, master plumber, septic tank and overflow, master mechanical, HVAC&R, gas and appliance): $40,000 bond.
Can a homeowner pull a permit in Nashville?
A property owner who occupies or intends to occupy a single-family residence may get a building permit (a self permit) to build or repair it. The owner signs a notarized affidavit saying the permit is not for a contractor, no permit for a duplex or single residence was issued or applied for in the last two years, and the work is not a home or addition of $25,000 or more for resale, lease or rent. The owner becomes fully responsible for code compliance and loses the protection of the contractor's permit bond. Homeowners must apply in person. Trade permits are usually issued to licensed subcontractors, but in certain cases may be issued directly to the homeowner.
Sources
13 official pages, checked November 6, 2026
- Building Permit Process · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Contractor Requirements for Building Permits · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Mechanical, Plumbing, and Electrical Examiners and Appeals Board · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Registration as a State Trades Contractor (2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Registration (Metro Trades License Registration, 2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Examination as a Master Electrician, Equipment Installer, Low Voltage Contractor or Journeyman Electrician (2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Metro Mechanical Exam (2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Metro Gas and Appliance Exam (2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Application for Metro Plumbing Exam (2022) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Codes and Building Safety E-Permits System for Contractors · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Trades Permits · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Residential Permit Procedures (brochure) · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
- Self-Permit Affidavit · Metro Nashville Department of Codes and Building Safety · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research