licenserules

Lebanon, TN · Local contractor rules

Contractor license requirements in Lebanon, Tennessee

What Lebanon requires before you work there, on top of Tennessee state licensing. Checked November 7, 2026 from 5 official sources.

Do I need a Lebanon license to work there?

Only for some trades: HVAC contractor.

Lebanon's gas code requires anyone who installs, extends or alters consumer gas piping or certain gas appliances to post a $10,000 bond and get a city license each year.2

This is on top of the Tennessee state license, if your trade has one. Check your trade

Pick your trade

Find your work below. Each row shows whether you need a Tennessee state license and which Lebanon license is yours. Open a row for the full checklist.

How to start working in Lebanon

  1. 1

    Get your Tennessee license if your trade needs one

    Tennessee licenses some trades and not others. The trade list above shows the state rule for yours.

  2. 2

    Get a surety bond

    $10,000

    Lebanon requires a $10,000 bond.2 You pay a yearly premium to a surety company, not the full amount. Estimate the cost

  3. 3

    Apply for your Lebanon license

    Apply with City of Lebanon Building Inspection Department. Bring the bond and insurance certificate.

    What each license needs

  4. 4

    Pull a permit for each job

    Building inspection plan reviews are submitted digitally through the city's GeoCivix portal.134

    More

    Inspections are requested by email to buildinginspection@lebanontn.org. Electrical permits are sold at 406 Tennessee Boulevard.

  5. 5

    Renew on time

    The license runs until the next January 1 unless revoked, and a new bond is given each January 1.

Lebanon license details

Gas installer license and bond HVAC contractor Fee— Bond$10,000

Who needs it

Any person who installs, extends or alters consumer's gas piping or certain gas appliances (conversion burners, floor furnaces, central heating plants, vented wall furnaces, water heaters and boilers).2

More

An individual working on his or her own premises needs no license or bond but must still follow the gas code, including permits, inspections and fees.

What you need

  • Deliver a bond to the commissioner of finance and revenue; after the bond is approved, get a nontransferable license from the commissioner and pay any license fees. A license obtained after July 1 costs half the annual fee.2

  • A permit from the city is needed to install a gas conversion burner, floor furnace, central heating plant, vented wall furnace, water heater, boiler or consumer's gas piping, or to convert piping to natural gas.2

Fees and bond

Bond2$10,000

A $10,000 bond with corporate surety, conditioned on doing the work in line with the gas code.

More

The bond expires each January 1 and a new bond is given for each year.

Renewal

The license runs until the next January 1 unless revoked, and a new bond is given each January 1.2

Apply on the official site
  • The city's Building Inspection Department does not do electrical inspections; they are done by State of Tennessee deputy electrical inspectors.1

For homeowners

Can I do the work and pull the permit myself?

Lebanon does not say on the pages we read. Ask the building department before you start.

Check a contractor before you hire

Lebanon requires contractors to hold a local license or registration and a bond. Ask for a copy of each.

Check a Tennessee license

Good to know

  • The city's Gas Bonded Contractors page shows a master list for gas bond renewal.5

  • The Title 12 copy posted on the city site adopts the 2018 International Building, Residential, Plumbing and Fuel Gas Codes, so it may not be the current version of the code.2

Common questions

Do I need a contractor license to work in Lebanon?

Only for some trades: HVAC contractor. Other trades need no Lebanon license, only any Tennessee license the trade requires.

Do Lebanon contractors need a bond?

Yes. Gas installer license and bond: $10,000 bond.

How long is a Lebanon contractor license good for?

The license runs until the next January 1 unless revoked, and a new bond is given each January 1.

Sources

5 official pages, checked November 7, 2026
  1. Building Inspection · City of Lebanon · checked 2026-11-07
  2. Title 12 - Building, Utility, etc. Codes (Lebanon Municipal Code) · City of Lebanon · checked 2026-11-07
  3. Applications, Bonds & Fees · City of Lebanon · checked 2026-11-07
  4. Electrical Permits · City of Lebanon · checked 2026-11-07
  5. Gas Bonded Contractors · City of Lebanon · checked 2026-11-07

Rules change. Confirm with the agency before you bid or start work. How we research

Other places in Tennessee