El Paso, TX · Local contractor rules
Contractor license requirements in El Paso, Texas
What El Paso requires before you work there, on top of Texas state licensing. Checked November 6, 2026 from 5 official sources.
Do I need an El Paso license to work there?
Yes. You need one El Paso license. Which one depends on the work you do.
El Paso requires contractors to file a contractor registration application with the Planning and Inspections Department every year to be eligible to get permits from the city.2
El Paso has 11 license types. You need only the one that fits your work:
General contractor registration For: General contractor, residential builder, roofer, fence contractor, pool and spa contractor Fee$100Bond$50,000 Electrical contractor registration For: Electrician Fee$0BondNot listed Mechanical contractor registration For: HVAC contractor Fee$0BondNot listed Plumbing contractor registration For: Plumber Fee$0BondNot listed Irrigation contractor registration For: Landscaper Fee$100BondNot listed Fire contractor registration For: Fire alarm, sprinkler and extinguisher contractors who pull permits in El Paso. Fee$0BondNot listed Barricade contractor registration For: Barricade contractors. Fee$100Bond$50,000 Engineering (pavement cut) general contractor and utility contractor registration For: Contractors doing pavement cuts or other work in the public right of way, registered as an ENG general contractor or ENG utility contractor. Fee$100Bond$10,000 Sign contractor registration (non-electrical) For: Non-electrical sign contractors. Fee$100Bond$25,000 Large sign installer (billboard) registration For: Large sign (billboard) installers. Fee$607Bond$50,000 Electrical sign contractor registration For: Electrical sign contractors. Fee$0BondNot listedThis is on top of the Texas state license, if your trade has one. Check your trade
Pick your trade
Find your work below. Each row shows whether you need a Texas state license and which El Paso license is yours. Open a row for the full checklist.
How to start working in El Paso
- 1
Get your Texas license if your trade needs one
Texas licenses some trades and not others. The trade list above shows the state rule for yours.
- 2
Get a surety bond
- General contractor registration$50,000
- Barricade contractor registration$50,000
- Engineering (pavement cut) general contractor and utility contractor registration$10,000
- Sign contractor registration (non-electrical)$25,000
- Large sign installer (billboard) registration$50,000
You pay a yearly premium to a surety company, not the full bond amount. Estimate the cost
- 3
Get a certificate of insurance
The minimums depend on which license you get. They are listed in each license below.
- 4
Apply for your El Paso license
Apply for the one that fits your work, with City of El Paso Planning and Inspections Department (One Stop Shop).
- General contractor registration$100
- Electrical contractor registration$0
- Mechanical contractor registration$0
- Plumbing contractor registration$0
- Irrigation contractor registration$100
- Fire contractor registration$0
- Barricade contractor registration$100
- Engineering (pavement cut) general contractor and utility contractor registration$100
- Sign contractor registration (non-electrical)$100
- Large sign installer (billboard) registration$607
- Electrical sign contractor registration$0
- 5
Pull a permit for each job
Permits go to registered contractors. With the exception of irrigation work, only a contractor registered with the city may be issued a trade permit for electrical, mechanical, plumbing or irrigation work.145
More
A registered contractor may not get a permit for an unregistered contractor, and permits cannot be transferred.
- 6
Renew on time
The registration application must be filed every year.
Details for each El Paso license type
You need only one of these: the one that fits your work.
General contractor registration General contractorResidential builderRooferFence contractorPool and spa contractor Fee$100 Bond$50,000
Who needs it
General contractors doing commercial work (new buildings, alterations, additions, tenant improvements, shells, commercial pools, foundations, storm water and grading) or residential work (new homes, additions, alterations, roofing, windows, fences and rock walls, retaining walls, residential pools, foundations, storm water and grading).3
What you need
Fees and bond
Blanket building construction bond of $50,000. A $10,000 bond can be submitted instead for irrigation, site lighting and landscape, temporary structures, mobile home placement, temporary signs, tents over 200 square feet, fences, patch and paint permits, and pavement cuts or excavation in the public right of way.
Insurance
General liability of at least $100,000 on the city's checklist, with the City of El Paso as certificate holder.3
More
The checklist also states minimum limits of $250,000 bodily injury per person, $500,000 aggregate, and $100,000 property damage per occurrence and $100,000 aggregate.
Renewal
The registration application must be filed every year.2
Electrical contractor registration Electrician Fee$0 Bond—
Who needs it
Electrical contractors who pull permits in El Paso.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
Mechanical contractor registration HVAC contractor Fee$0 Bond—
Who needs it
Mechanical contractors who pull permits in El Paso.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
Plumbing contractor registration Plumber Fee$0 Bond—
Who needs it
Plumbing contractors who pull permits in El Paso.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
Irrigation contractor registration Landscaper Fee$100 Bond—
Who needs it
Irrigation contractors who pull permits in El Paso.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
Fire contractor registration Fee$0 Bond—
Who needs it
Fire alarm, sprinkler and extinguisher contractors who pull permits in El Paso.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
Barricade contractor registration Fee$100 Bond$50,000
Who needs it
Barricade contractors.3
What you need
Assumed name certificate or corporate documents if applicable, the registration application, general liability insurance and a blanket building construction bond.3
Fees and bond
Blanket building construction bond of $50,000.
Insurance
General liability of at least $250,000, with the City of El Paso as certificate holder.3
Renewal
The registration application must be filed every year.2
Engineering (pavement cut) general contractor and utility contractor registration Fee$100 Bond$10,000
Who needs it
Contractors doing pavement cuts or other work in the public right of way, registered as an ENG general contractor or ENG utility contractor.3
What you need
Assumed name certificate or corporate documents if applicable, the registration application, general liability insurance and a blanket building construction bond.3
Fees and bond
Blanket building construction bond of $10,000.
Insurance
General liability of at least $200,000, with the City of El Paso as certificate holder.3
Renewal
The registration application must be filed every year.2
Sign contractor registration (non-electrical) Fee$100 Bond$25,000
Who needs it
Non-electrical sign contractors.3
What you need
Assumed name certificate or corporate documents if applicable, the registration application, general liability insurance and a blanket building construction bond.3
Fees and bond
Blanket building construction bond of $25,000.
Insurance
General liability of at least $100,000, with the City of El Paso as certificate holder.3
Renewal
The registration application must be filed every year.2
Large sign installer (billboard) registration Fee$607 Bond$50,000
Who needs it
Large sign (billboard) installers.3
What you need
Assumed name certificate or corporate documents if applicable, the registration application, general liability insurance and a blanket building construction bond.3
Fees and bond
Blanket building construction bond of $50,000.
Insurance
General liability of at least $100,000, with the City of El Paso as certificate holder.3
Renewal
The registration application must be filed every year.2
Electrical sign contractor registration Fee$0 Bond—
Who needs it
Electrical sign contractors.3
What you need
Fees and bond
Renewal
The registration application must be filed every year.2
For homeowners
Can I do the work and pull the permit myself?
A homeowner may get a permit for work on their own home upon proof of ownership.45
More
The 2016 Title 18 ordinance text limits homeowner permits to an R-3 home that is the owner's current primary residence, where the owner acts as general contractor and does some or all of the work, with electrical, plumbing, mechanical and irrigation work done by city-registered contractors. Homeowners doing the work themselves on their homestead do not need a bond.
Check a contractor before you hire
El Paso requires contractors to hold one of the local licenses above and a bond and insurance. Ask for a copy of each.
Good to know
Common questions
Do I need a contractor license to work in El Paso?
Yes. El Paso has 11 license types (General contractor registration; Electrical contractor registration; Mechanical contractor registration; Plumbing contractor registration; Irrigation contractor registration; Fire contractor registration; Barricade contractor registration; Engineering (pavement cut) general contractor and utility contractor registration; Sign contractor registration (non-electrical); Large sign installer (billboard) registration; Electrical sign contractor registration). You need the one that fits your work, plus any Texas license your trade needs.
How much does a El Paso contractor license cost?
It depends on the license type. General contractor registration: $100 (annual registration fee (plus technology fee)). Electrical contractor registration: $0 (annual registration fee). Mechanical contractor registration: $0 (annual registration fee). Plumbing contractor registration: $0 (annual registration fee). Irrigation contractor registration: $100 (annual registration fee (plus technology fee)). Fire contractor registration: $0 (annual registration fee). Barricade contractor registration: $100 (annual registration fee (plus technology fee)). Engineering (pavement cut) general contractor and utility contractor registration: $100 (annual registration fee (plus technology fee)). Sign contractor registration (non-electrical): $100 (annual registration fee (plus technology fee)). Large sign installer (billboard) registration: $607 (annual registration fee (plus technology fee)). Electrical sign contractor registration: $0 (annual registration fee).
Do El Paso contractors need a bond?
Yes, and the amount depends on the license type. General contractor registration: $50,000 bond. Barricade contractor registration: $50,000 bond. Engineering (pavement cut) general contractor and utility contractor registration: $10,000 bond. Sign contractor registration (non-electrical): $25,000 bond. Large sign installer (billboard) registration: $50,000 bond.
Can a homeowner pull a permit in El Paso?
A homeowner may get a permit for work on their own home upon proof of ownership. The 2016 Title 18 ordinance text limits homeowner permits to an R-3 home that is the owner's current primary residence, where the owner acts as general contractor and does some or all of the work, with electrical, plumbing, mechanical and irrigation work done by city-registered contractors. Homeowners doing the work themselves on their homestead do not need a bond.
How long is a El Paso contractor license good for?
The registration application must be filed every year.
Sources
5 official pages, checked November 6, 2026
- Planning & Inspections · City of El Paso · checked 2026-11-06
- Contractor Registration Application and Contractor Authorization Form · City of El Paso Planning and Inspections · checked 2026-11-06
- Contractor Registration Requirements (Rev. 07/2024) · City of El Paso Planning and Inspections · checked 2026-11-06
- When Do I Need a Permit? · City of El Paso Planning and Inspections · checked 2026-11-06
- Ordinance amending Title 18, Chapter 18.02 (Administrative Code), City Council agenda May 31, 2016 · City of El Paso Municipal Clerk · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research