Electrician · Smithville, MO

Electrician license requirements in Smithville, Missouri

Everything an electrician needs to work legally in Smithville: the Missouri state rule and the local license. Checked November 7, 2026 from 17 official sources.

What does an electrician need to work in Smithville?

You need two licenses: one from Missouri and one from Smithville.

1

Missouri state license · required

Statewide Electrical Contractor License (optional)

Details
2

Smithville license · required

Master's license proof (electrical, mechanical, plumbing)

Smithville fee
Not published
Smithville bond
None listed
Missouri bond
None listed
Insurance
Not listed

Steps to work as an electrician in Smithville

  1. 1

    Get the Missouri Statewide Electrical Contractor License (optional)

    The statewide license is optional. Missouri law does not make anyone get it.34567

    More

    A contractor who works only where no local license is needed, or only where the contractor holds the local license, does not need the statewide license. Cities and counties may still issue their own electrical contractor licenses, but must accept the statewide license in place of a local license. The law covers the business of installing, erecting or maintaining electrical wiring, fixtures and equipment of any voltage. Utility employees, railroads, utility line contractors, broadcasters and low-voltage, data and communications cabling contractors are exempt.

    Exams, experience and state fees

  2. 2

    Apply for your Smithville license

    Master's license proof (electrical, mechanical, plumbing) Bring the bond and insurance certificate.

    What the application needs

  3. 3

    Pull a permit for each job

    The city's residential building guidelines are for property owners and contractors; building inspection questions go to the Development Department at 816-532-3897.1

Smithville license details

Master's license proof (electrical, mechanical, plumbing) ElectricianHVAC contractorPlumber Fee— Bond—

Who needs it

Electrical, mechanical and plumbing contractors, including subcontractors covered by a general contractor's blanket license.12

What you need

  • A current master's license issued by a city that proctors a nationally recognized exam (the city names Block), plus a statement from that jurisdiction describing the licensing test it requires.1

Apply on the official site
Business license

The occupation license is the city business license; licenses expire November 30.2

Missouri rules in short

State license

Statewide Electrical Contractor License (optional). Full Missouri requirements

Job size limit

The statewide license is optional. Missouri law does not make anyone get it.34567

More

A contractor who works only where no local license is needed, or only where the contractor holds the local license, does not need the statewide license. Cities and counties may still issue their own electrical contractor licenses, but must accept the statewide license in place of a local license. The law covers the business of installing, erecting or maintaining electrical wiring, fixtures and equipment of any voltage. Utility employees, railroads, utility line contractors, broadcasters and low-voltage, data and communications cabling contractors are exempt.

State bond

The state does not hold a bond for this license. The contractor must post a bond with each city or county where it works if that place requires one, and show the state proof of it when applying.34

State liability insurance

Applicants must show liability insurance of $500,000, on a certificate from an insurer authorized in Missouri.348

Hiring an electrician in Smithville?

What to ask for

A current Missouri Statewide Electrical Contractor License (optional), the Smithville master's license proof (electrical, mechanical, plumbing).

Check a Missouri license

Sources

17 official pages, checked November 7, 2026
  1. Building Guidelines, 2018 IRC Building Code (PDF) · City of Smithville Development Department · checked 2026-11-07
  2. Application for an Occupation License (PDF) · City of Smithville, Missouri · checked 2026-11-07
  3. FAQ's for Electrical Contractors · Missouri Office of Statewide Electrical Contractors · checked 2026-11-06
  4. Revised Statutes of Missouri, RSMo Section 324.920: Application requirements · Missouri Revisor of Statutes · checked 2026-11-06
  5. Revised Statutes of Missouri, RSMo Section 324.925: Political subdivisions to recognize statewide licensure · Missouri Revisor of Statutes · checked 2026-11-06
  6. Revised Statutes of Missouri, RSMo Section 324.900: Definitions · Missouri Revisor of Statutes · checked 2026-11-06
  7. Revised Statutes of Missouri, RSMo Section 324.915: Work exempt from statutory requirements · Missouri Revisor of Statutes · checked 2026-11-06
  8. Statewide Electrical Contractors License Application Instructions · Missouri Office of Statewide Electrical Contractors · checked 2026-11-06
  9. Approved Examinations · Missouri Office of Statewide Electrical Contractors · checked 2026-11-06
  10. Office of Statewide Electrical Contractors - Fees · Missouri Division of Professional Registration · checked 2026-11-06
  11. Revised Statutes of Missouri, RSMo Section 287.030: Employer defined · Missouri Revisor of Statutes · checked 2026-11-06
  12. Revised Statutes of Missouri, RSMo Section 324.935: Renewal of licensure · Missouri Revisor of Statutes · checked 2026-11-06
  13. Office of Statewide Electrical Contractors - Renewal Information · Missouri Division of Professional Registration · checked 2026-11-06
  14. Office of Statewide Electrical Contractors · Missouri Division of Professional Registration · checked 2026-11-06
  15. FAQ's for Political Subdivisions · Missouri Office of Statewide Electrical Contractors · checked 2026-11-06
  16. Revised Statutes of Missouri, RSMo Section 324.940: Refusal to issue or renew license · Missouri Revisor of Statutes · checked 2026-11-06
  17. Revised Statutes of Missouri, RSMo Section 324.945: Violations, penalties · Missouri Revisor of Statutes · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research