licenserules

Portland, ME · Local contractor rules

Contractor license requirements in Portland, Maine

What Portland requires before you work there, on top of Maine state licensing. Checked November 6, 2026 from 3 official sources.

Do I need a Portland license to work there?

No. Portland does not license contractors.

Portland's building code (Chapter 6, Article II of the City Code) requires permits for building, plumbing and electrical work but does not set up a city contractor license or registration.2

You still need any Maine state license your trade requires, and permits for the work. Check your trade

Pick your trade

Find your work below. Each row shows whether you need a Maine state license and which Portland license is yours. Open a row for the full checklist.

Trades without a Portland license

Chapter 6 sets no city license for trades. Work needs a city permit, and electrical and oil burner work must be done by holders of the matching state license.2

How to start working in Portland

  1. 1

    Get your Maine license if your trade needs one

    Maine licenses some trades and not others. The trade list above shows the state rule for yours.

  2. 2

    Pull a permit for each job

    No one may start building, plumbing or electrical work without a permit from the building authority.12

    More

    All building, fire, electrical, plumbing and HVAC permits must be submitted online through the city's Citizen Self Service (CSS) portal. A permit obtained after work has started costs double the normal fee. Electrical permits cannot be transferred, and the work must be done by or under the supervision of the permit holder.

    Open the Portland permit portal

How it works in Portland

  • An electrical permit is issued only to an applicant who holds a State of Maine master electrician's license, or a limited or special license for the work.2

    More

    Anyone who installs or services oil burner equipment must hold a Maine Fuel Board license.

For homeowners

Can I do the work and pull the permit myself?

A person without a master, limited or special electrical license may get an electrical permit and do limited electrical work only on a single-family home they own and live in, and may not connect wires into any service panel or touch the main service entrance.2

Check a contractor before you hire

Portland does not license contractors, so check the Maine license for the trade instead.

Check a Maine license

Good to know

  • The general building permit fee is $25 for the first $1,000 of work and $15 for each additional $1,000.3

    More

    Plumbing permits have a $40 minimum (up to four fixtures) plus a $10 city surcharge.

  • An electrical permit expires if work is not substantially started within 90 days or is stopped for 120 days.2

  • Questions go to the Permitting and Inspections Department, 389 Congress Street, (207) 874-8703 or permitting@portlandmaine.gov.1

Common questions

Do I need a contractor license to work in Portland?

No. Portland does not license contractors. You still need any Maine license your trade requires, and permits for the work.

Can a homeowner pull a permit in Portland?

A person without a master, limited or special electrical license may get an electrical permit and do limited electrical work only on a single-family home they own and live in, and may not connect wires into any service panel or touch the main service entrance.

Sources

3 official pages, checked November 6, 2026
  1. Instructions for Submitting Permit Applications Online · City of Portland Permitting and Inspections Department · checked 2026-11-06
  2. City Code Chapter 6, Buildings and Building Regulations · City of Portland, Maine · checked 2026-11-06
  3. Building Permits and Inspections Fee Schedule (revised 7/2026) · City of Portland Permitting and Inspections Department · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research