licenserules

Roofer · Romeoville, IL

Roofer license requirements in Romeoville, Illinois

Everything a roofer needs to work legally in Romeoville: the Illinois state rule and the local license. Checked November 6, 2026 from 8 official sources.

What does a roofer need to work in Romeoville?

You need two licenses: one from Illinois and one from Romeoville.

1

Illinois state license · required

Roofing Contractor License (Limited or Unlimited)

Details
2

Romeoville license · required

Sub-contractor license

Romeoville fee
$75
Romeoville bond
$10,000
Illinois bond
$10,000
Insurance
Proof required

Steps to work as a roofer in Romeoville

  1. 1

    Get the Illinois Roofing Contractor License (Limited or Unlimited)

    Any business that provides roofing services, and any roofing or waterproofing work, needs an IDFPR roofing license.2

    More

    There is no dollar threshold. The Act does not apply to work on your own property, unpaid work, greenhouses, or farm buildings, and sellers of roofing services or materials who use licensed roofers are not covered.

    Exams, experience and state fees

  2. 2

    Get your surety bonds

    • Illinois state bond235$10,000
    • Romeoville sub-contractor license1$10,000

    You pay a yearly premium, not the full bond amount. Estimate the cost

  3. 3

    Get a certificate of insurance

    Workers' compensation of $100,000 each accident, $500,000 policy limit and $100,000 each employee; general liability of $1,000,000 per occurrence and $2,000,000 (as listed on the form).1

    More

    The Village of Romeoville must be named as additional insured, and the certificate must say the insurer gives the village at least 10 days' written notice before cancelling.

  4. 4

    Apply for your Romeoville license

    $75

    Sub-contractor license: $75 sub-contractor license (12 months, per the posted application form).1 Bring the bond and insurance certificate.

    What the application needs

  5. 5

    Pull a permit for each job

    Building permits are required for most home improvements and additions.78

    More

    The owner of the property or the owner's agent applies for the permit and names the contractor, if any. Building permits are applied for online. Work without a permit can bring a fine or a stop-work order.

    Open the permit portal

Romeoville license details

Sub-contractor license General contractorResidential builderRooferElectrician Fee$75 Bond$10,000

Who needs it

Subcontractors working within village limits. The application asks for the type of contractor and the general contractor they work with.1

What you need

  • A completed sub-contractor license application, a $10,000 license and permit bond, and a certificate of insurance.1

  • Roofers include a copy of their state roofer's license; electrical contractors include a copy of their electrical license.1

Fees and bond

Sub-contractor license (12 months, per the posted application form)1$75
Bond1$10,000

A $10,000 license and permit bond.

Insurance

Workers' compensation of $100,000 each accident, $500,000 policy limit and $100,000 each employee; general liability of $1,000,000 per occurrence and $2,000,000 (as listed on the form).1

More

The Village of Romeoville must be named as additional insured, and the certificate must say the insurer gives the village at least 10 days' written notice before cancelling.

Renewal

The license on the posted application form runs 12 months.1

Apply on the official site

Illinois rules in short

State license

Roofing Contractor License (Limited or Unlimited). Full Illinois requirements

Job size limit

Any business that provides roofing services, and any roofing or waterproofing work, needs an IDFPR roofing license.2

More

There is no dollar threshold. The Act does not apply to work on your own property, unpaid work, greenhouses, or farm buildings, and sellers of roofing services or materials who use licensed roofers are not covered.

State bond

A limited license needs a continuous surety bond of $10,000.235

More

An unlimited license needs a $25,000 bond. The bond must come from a company authorized to write surety bonds in Illinois, use the IDFPR form (BD-LRF or BD-URF), and give IDFPR 60 days' notice before it is cancelled. The license is cancelled when the bond ends unless a new bond is filed.

State liability insurance

Licensees must carry public liability and property damage insurance of at least $250,000 per occurrence for property damage and $500,000 per occurrence for personal injury.35

More

Proof is the IDFPR RF-INS form, and the policy must give IDFPR 30 days' notice before cancellation.

Hiring a roofer in Romeoville?

What to ask for

A current Illinois Roofing Contractor License (Limited or Unlimited), the Romeoville sub-contractor license, and a certificate of insurance.

Check an Illinois license

Doing the work yourself

The owner of a single-family home, townhouse or one- or two-family dwelling may do their own electrical work, except installing a new service or moving an existing service.8

More

Owners of commercial, industrial or retail buildings may not do their own electrical work.

Sources

8 official pages, checked November 6, 2026
  1. Sub-Contractor License Application · Village of Romeoville · checked 2026-11-06
  2. Illinois Roofing Industry Licensing Act (225 ILCS 335) · Illinois General Assembly · checked 2026-11-06
  3. 68 Ill. Adm. Code Part 1460, Illinois Roofing Industry Licensing Act · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
  4. Application for the Roofing Contractors Qualifying Party Examination (RF-QP, packet updated 2/14/24) · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  5. Application for: Licensed Roofing Contractor (DPR-RF, packet updated 10/2/24) · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  6. IDFPR | Roofing Contractor · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  7. Building Permits · Village of Romeoville · checked 2026-11-06
  8. Title XV, Chapter 150: Building Ordinance · Village of Romeoville · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research