licenserules

Electrician · Romeoville, IL

Electrician license requirements in Romeoville, Illinois

Everything an electrician needs to work legally in Romeoville: the Illinois state rule and the local licenses. Checked November 6, 2026 from 7 official sources.

What does an electrician need to work in Romeoville?

You need one license, from Romeoville. Illinois has no state license for this trade.

Romeoville has 2 license types that cover this trade. You need only the one that fits your work. Each is described below.

1

Romeoville license · required · pick one

Romeoville fee
$75
Romeoville bond
$10,000
Illinois bond
None listed
Insurance
Proof required

Steps to work as an electrician in Romeoville

  1. 1

    Get your surety bond

    $10,000

    Romeoville requires a $10,000 bond for this license.1

    You pay a yearly premium, not the full bond amount. Estimate the cost

  2. 2

    Get a certificate of insurance

    The minimums depend on which license you get. They are listed in each license below.

  3. 3

    Apply for your Romeoville license

    Apply for the one that fits your work.

    What the application needs

  4. 4

    Pull a permit for each job

    Building permits are required for most home improvements and additions.27

    More

    The owner of the property or the owner's agent applies for the permit and names the contractor, if any. Building permits are applied for online. Work without a permit can bring a fine or a stop-work order.

    Open the permit portal

The 2 Romeoville license types (you need one)

Sub-contractor license General contractorResidential builderRooferElectrician Fee$75 Bond$10,000

Who needs it

Subcontractors working within village limits. The application asks for the type of contractor and the general contractor they work with.1

What you need

  • A completed sub-contractor license application, a $10,000 license and permit bond, and a certificate of insurance.1

  • Roofers include a copy of their state roofer's license; electrical contractors include a copy of their electrical license.1

Fees and bond

Sub-contractor license (12 months, per the posted application form)1$75
Bond1$10,000

A $10,000 license and permit bond.

Insurance

Workers' compensation of $100,000 each accident, $500,000 policy limit and $100,000 each employee; general liability of $1,000,000 per occurrence and $2,000,000 (as listed on the form).1

More

The Village of Romeoville must be named as additional insured, and the certificate must say the insurer gives the village at least 10 days' written notice before cancelling.

Renewal

The license on the posted application form runs 12 months.1

Apply on the official site
Electrical contractor registration Electrician Fee— Bond—

Who needs it

Anyone in the business of installing or altering electrical equipment by contract.2

More

Public utility equipment under the Illinois Commerce Commission is not included.

What you need

  • The village building code makes it unlawful to work as an electrical contractor without being registered, bonded and insured with the village.2

Apply on the official site

Illinois rules in short

State license

No state license. Cities or counties may license it. Full Illinois requirements

Hiring an electrician in Romeoville?

What to ask for

the Romeoville sub-contractor license or electrical contractor registration, and a certificate of insurance.

Check an Illinois license

Doing the work yourself

The owner of a single-family home, townhouse or one- or two-family dwelling may do their own electrical work, except installing a new service or moving an existing service.2

More

Owners of commercial, industrial or retail buildings may not do their own electrical work.

Sources

7 official pages, checked November 6, 2026
  1. Sub-Contractor License Application · Village of Romeoville · checked 2026-11-06
  2. Title XV, Chapter 150: Building Ordinance · Village of Romeoville · checked 2026-11-06
  3. Illinois Municipal Code (65 ILCS 5), full text · Illinois General Assembly · checked 2026-11-06
  4. Bill Status of SB2307, 104th General Assembly (Electrician Licensing Act) · Illinois General Assembly · checked 2026-11-06
  5. IDFPR | Professions and Industries Regulated by IDFPR · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  6. 83 Ill. Adm. Code Part 468, Distributed Generation Installer Certification · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
  7. Building Permits · Village of Romeoville · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research