licenserules

Roofer · Palos Park, IL

Roofer license requirements in Palos Park, Illinois

Everything a roofer needs to work legally in Palos Park: the Illinois state rule and the local license. Checked November 6, 2026 from 10 official sources.

What does a roofer need to work in Palos Park?

You need two licenses: one from Illinois and one from Palos Park.

1

Illinois state license · required

Roofing Contractor License (Limited or Unlimited)

Details
2

Palos Park license · required

Contractor registration

Palos Park fee
$100
Palos Park bond
None listed
Illinois bond
$10,000
Insurance
Proof required

Steps to work as a roofer in Palos Park

  1. 1

    Get the Illinois Roofing Contractor License (Limited or Unlimited)

    Any business that provides roofing services, and any roofing or waterproofing work, needs an IDFPR roofing license.4

    More

    There is no dollar threshold. The Act does not apply to work on your own property, unpaid work, greenhouses, or farm buildings, and sellers of roofing services or materials who use licensed roofers are not covered.

    Exams, experience and state fees

  2. 2

    Get your surety bond

    • Illinois state bond457$10,000

    You pay a yearly premium, not the full bond amount. Estimate the cost

  3. 3

    Get a certificate of insurance

    A certificate of general comprehensive liability insurance of $300,000 per occurrence, with the village as certificate holder.1

  4. 4

    Apply for your Palos Park license

    $100

    Contractor registration: $100 full-year registration fee (through december 31, 2026).1 Bring the bond and insurance certificate.

    What the application needs

  5. 5

    Pull a permit for each job

    All contractors listed on a building permit must be registered with the village before the permit is issued. Applications and plans are sent by email to permits@palospark.org.29

Palos Park license details

Contractor registration General contractorResidential builderElectricianHVAC contractorPlumberRoofer Fee$100 Bond—

Who needs it

All contractors working in the village. The application lists electrical, HVAC, plumbing and roofing as examples of types of work.12

What you need

  • A completed registration application and a signed Construction Conduct Acknowledgment form.1

  • Electricians must provide a current copy of their certification from an approved testing municipality.1

  • Asbestos, roofing, elevator and fire sprinkler contractors must provide a current copy of their state license.1

  • Plumbers, irrigation, water well and private alarm contractors must provide a current copy of their state license and are exempt from the registration fee.13

    More

    Plumbers send a copy of their Illinois or City of Chicago plumber's license with the application.

  • A Home Occupation Acknowledgment form is required if the contractor's office, workshop or storage is in a residentially zoned area of Palos Park.1

  • Contractors must keep application information, licenses and insurance up to date, or the registration is void.1

Fees and bond

Full-year registration fee (through December 31, 2026)1$100
Partial-year fee (September 1 to December 31, 2026)1$55

Insurance

A certificate of general comprehensive liability insurance of $300,000 per occurrence, with the village as certificate holder.1

Renewal

The 2026 registration is in effect through December 31, 2026.1

Apply on the official site

Illinois rules in short

State license

Roofing Contractor License (Limited or Unlimited). Full Illinois requirements

Job size limit

Any business that provides roofing services, and any roofing or waterproofing work, needs an IDFPR roofing license.4

More

There is no dollar threshold. The Act does not apply to work on your own property, unpaid work, greenhouses, or farm buildings, and sellers of roofing services or materials who use licensed roofers are not covered.

State bond

A limited license needs a continuous surety bond of $10,000.457

More

An unlimited license needs a $25,000 bond. The bond must come from a company authorized to write surety bonds in Illinois, use the IDFPR form (BD-LRF or BD-URF), and give IDFPR 60 days' notice before it is cancelled. The license is cancelled when the bond ends unless a new bond is filed.

State liability insurance

Licensees must carry public liability and property damage insurance of at least $250,000 per occurrence for property damage and $500,000 per occurrence for personal injury.57

More

Proof is the IDFPR RF-INS form, and the policy must give IDFPR 30 days' notice before cancellation.

Hiring a roofer in Palos Park?

What to ask for

A current Illinois Roofing Contractor License (Limited or Unlimited), the Palos Park contractor registration, and a certificate of insurance.

Check an Illinois license

Doing the work yourself

The building permit application lets the applicant be the property owner, a general contractor representative or a tenant.910

More

The village says you or your contractor must get the permit and post it before work starts.

Sources

10 official pages, checked November 6, 2026
  1. 2026 Contractor Registration Application · Village of Palos Park Community Development Department · checked 2026-11-06
  2. Applications & Forms · Village of Palos Park · checked 2026-11-06
  3. Plumbers' Information Sheet and Letter of Intent · Village of Palos Park Community Development Department · checked 2026-11-06
  4. Illinois Roofing Industry Licensing Act (225 ILCS 335) · Illinois General Assembly · checked 2026-11-06
  5. 68 Ill. Adm. Code Part 1460, Illinois Roofing Industry Licensing Act · Illinois General Assembly, Joint Committee on Administrative Rules · checked 2026-11-06
  6. Application for the Roofing Contractors Qualifying Party Examination (RF-QP, packet updated 2/14/24) · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  7. Application for: Licensed Roofing Contractor (DPR-RF, packet updated 10/2/24) · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  8. IDFPR | Roofing Contractor · Illinois Department of Financial and Professional Regulation · checked 2026-11-06
  9. Building Permit Application · Village of Palos Park Community Development Department · checked 2026-11-06
  10. Tips for Hiring a Contractor · Village of Palos Park · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research