licenserules

Pooler, GA · Local contractor rules

Contractor license requirements in Pooler, Georgia

What Pooler requires before you work there, on top of Georgia state licensing. Checked November 7, 2026 from 7 official sources.

Do I need a Pooler license to work there?

Only for some trades: Electrician, plumber and HVAC contractor.

Pooler's Building & Inspections office issues building permits and does inspections for new construction, alterations, repairs, removals and demolition. All forms and applications go through an online portal.1

This is on top of the Georgia state license, if your trade has one. Check your trade

Pick your trade

Find your work below. Each row shows whether you need a Georgia state license and which Pooler license is yours. Open a row for the full checklist.

Trades without a Pooler license

The residential and commercial building permit applications include the state Authorized Permit Agent form.45

More

A qualifying agent who sends someone else to pull the permit gives the permit office a notarized original form with a copy of the contractor's license, the company license and the agent's driver's license.

How to start working in Pooler

  1. 1

    Get your Georgia license if your trade needs one

    Georgia licenses some trades and not others. The trade list above shows the state rule for yours.

  2. 2

    Apply for your Pooler license

    Apply with City of Pooler Building & Inspections (Planning & Development). Bring the bond and insurance certificate.

    What each license needs

  3. 3

    Business license or tax registration

    Businesses with a location in Pooler, organizations doing business in the city, and out-of-state businesses with no licensed Georgia location that have employees or agents serving customers in the city (the city names out-of-state contractors as an example) need a Pooler business license (occupational tax certificate).6

    More

    The tax is based on number of employees. It is payable January 1 each year; a 10% penalty plus 1.5% per month applies when unpaid 90 days after the due date.

  4. 4

    Pull a permit for each job

    Building permit applications and forms are submitted through the city's online portal, which needs a registered account.14

    More

    Permits become void if work does not start within six months or stops for six months.

    Open the Pooler permit portal

Pooler license details

Subcontractor Certification of Work (state and local business license) ElectricianHVAC contractorPlumber Fee— Bond—

Who needs it

Subcontractors doing electrical, mechanical or plumbing work on a permitted project.2

What you need

  • Each electrical, mechanical and plumbing subcontractor certifies that they have both a valid state license and a local business license, and attaches copies of both.2

    More

    The form asks for the company name, state license number and business license number.

  • The plumbing permit application asks for the contractor's local business license number and state license number.3

Apply on the official site
  • Electrical, mechanical and plumbing subcontractors must sign a Subcontractor Certification of Work stating they hold both a valid state license and a local business license, and attach copies of both.2

For homeowners

Can I do the work and pull the permit myself?

A homeowner may act as their own general contractor without a state contractor license or occupational tax certificate by signing a Homeowner/Builder Affidavit.7

More

The permit must be only for the owner's family to occupy or use, the home may not be built to sell or rent, and the owner may not build another home as a homeowner/builder for two years after the Certificate of Occupancy.

Check a contractor before you hire

Pooler requires contractors to hold a local license or registration. Ask for a copy of each.

Check a Georgia license

Common questions

Do I need a contractor license to work in Pooler?

Only for some trades: electrician, plumber and HVAC contractor. Other trades need no Pooler license, only any Georgia license the trade requires.

Can a homeowner pull a permit in Pooler?

A homeowner may act as their own general contractor without a state contractor license or occupational tax certificate by signing a Homeowner/Builder Affidavit. The permit must be only for the owner's family to occupy or use, the home may not be built to sell or rent, and the owner may not build another home as a homeowner/builder for two years after the Certificate of Occupancy.

Sources

7 official pages, checked November 7, 2026
  1. Building & Inspections · City of Pooler · checked 2026-11-07
  2. Subcontractor Certification of Work (PDF, updated June 2023) · City of Pooler · checked 2026-11-07
  3. Plumbing Permit Application (PDF, updated Sept 2026) · City of Pooler · checked 2026-11-07
  4. Residential Building Permit Application (PDF, updated June 2023) · City of Pooler · checked 2026-11-07
  5. Commercial Building Permit Application (PDF, 2024) · City of Pooler · checked 2026-11-07
  6. Business Registration & Events · City of Pooler · checked 2026-11-07
  7. Homeowner/Builder Affidavit (PDF, updated June 2023) · City of Pooler · checked 2026-11-07

Rules change. Confirm with the agency before you bid or start work. How we research

Other places in Georgia