licenserules

Electrician · Miami-Dade County, FL

Electrician license requirements in Miami-Dade County, Florida

Everything an electrician needs to work legally in Miami-Dade County: the Florida state rule and the local license. Checked November 6, 2026 from 11 official sources.

What does an electrician need to work in Miami-Dade County?

You need two licenses: one from Florida and one from Miami-Dade County.

1

Florida state license · required

Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER)

Details
2

Miami-Dade County license · required

Electrical certificates of competency (master and journeyman)

Miami-Dade County fee
$240
Miami-Dade County bond
None listed
Florida bond
None listed
Insurance
Proof required

Steps to work as an electrician in Miami-Dade County

  1. 1

    Get the Florida Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER)

    Section 489.503 lists exemptions from the electrical contractor license, such as owner-builders and some low-voltage landscape lighting, but it has no general dollar threshold for minor electrical work.5

    Exams, experience and state fees

  2. 2

    Get a certificate of insurance

    Masters must show liability and workers' compensation insurance after board approval.2

  3. 3

    Apply for your Miami-Dade County license

    $240

    Electrical certificates of competency (master and journeyman): $240 journeyman application.2 Bring the bond and insurance certificate.

    What the application needs

  4. 4

    Pull a permit for each job

    Unincorporated Miami-Dade permits are issued to contractors certified by the county or the state.2910

    More

    Workers' compensation insurance must first be presented to the Contractor Licensing Section to pull permits in unincorporated Miami-Dade; municipal building departments check it at permit time. State-certified contractors may use a voluntary registration to get permits more easily in unincorporated Miami-Dade.

    Open the permit portal

Miami-Dade County license details

Electrical certificates of competency (master and journeyman) Electrician Fee$240 Bond—

Who needs it

Master electrician, master burglar alarm, master fire alarm, master low voltage and master sign electrician (contracting categories, which also require state registration), and journeyman electrician, burglar alarm, fire alarm and sign electrician (who may work only under a master).12

What you need

  • Journeyman: 3 years of field experience (education may count for up to half) and a technical exam with a passing grade of 75 percent.12

  • Master: 2 years holding a CTQB journeyman certificate plus 2 years of prior field experience, or equivalent training or engineering registration; two-part exam with a passing grade of 70 percent.12

Fees and bond

Journeyman application2$240
Master personal application2$315
Business application (master)2$315

Insurance

Masters must show liability and workers' compensation insurance after board approval.2

Renewal

Renews generally every two years with 16 hours of continuing education.3

Apply on the official site
Business license

A local business tax receipt alone does not allow someone to contract; a contractor must be certified by the state or by the county CTQB.11

Florida rules in short

State license

Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER). Full Florida requirements

Job size limit

Section 489.503 lists exemptions from the electrical contractor license, such as owner-builders and some low-voltage landscape lighting, but it has no general dollar threshold for minor electrical work.5

State liability insurance

Before contracting, electrical contractors must carry public liability of $100,000 per person and $300,000 per occurrence plus $500,000 property damage, or a combined single limit policy of at least $800,000 (rule 61G6-5.008).6

Hiring an electrician in Miami-Dade County?

What to ask for

A current Florida Certified Electrical Contractor (EC) or Registered Electrical Contractor (ER), the Miami-Dade County electrical certificates of competency (master and journeyman), and a certificate of insurance.

Miami-Dade County contractor list Check a Florida license

Doing the work yourself

An owner may build or improve a one- or two-family residence or farm outbuilding for the owner's own use, not for sale or lease, with the property in an individual's name.10

More

For commercial property, an owner may build a one-story building or addition up to 500 square feet, or do repairs up to $5,000. A sale or lease within 24 months of permit issuance is presumed to violate the exemption. After plan approval the owner must pass an owner-builder validation, in person or virtually, with photo ID and proof the property is the primary residence.

Sources

11 official pages, checked November 6, 2026
  1. Construction Trades Qualifying Board List of Certification Categories · Miami-Dade County · checked 2026-11-06
  2. Contractors & Building Trades · Miami-Dade County · checked 2026-11-06
  3. Contractor License Renewal · Miami-Dade County · checked 2026-11-06
  4. Electrical Contractors · Florida Department of Business and Professional Regulation · checked 2026-11-05
  5. The 2026 Florida Statutes, 489.503 Exemptions · Florida Legislature · checked 2026-11-05
  6. DBPR ECLB 1 Application for Initial Certification by Examination (Eff. June 2022) · Florida Department of Business and Professional Regulation, Electrical Contractors' Licensing Board · checked 2026-11-05
  7. DBPR ECLB 8 Certified Electrical Contractor Exam Application (Eff. September 2022) · Florida Department of Business and Professional Regulation, Electrical Contractors' Licensing Board · checked 2026-11-05
  8. Coverage Requirements · Florida Department of Financial Services, Division of Workers' Compensation · checked 2026-11-05
  9. CTQB Application for Business Certification (revised 1/28/2026) · Miami-Dade County · checked 2026-11-06
  10. Owner-Builder Permits · Miami-Dade County · checked 2026-11-06
  11. What to Know When Hiring A Contractor · Miami-Dade County · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research