Solar installer · Severance, CO
Solar installer license requirements in Severance, Colorado
Everything a solar installer needs to work legally in Severance: the Colorado state rule and the local license. Checked November 10, 2026 from 5 official sources.
What does a solar installer need to work in Severance?
You need two licenses: one from Colorado and one from Severance.
Colorado state license · required
Photovoltaic Installer registration (or Electrical Contractor registration)
Severance license · required
Class B2 limited residential contractor license (solar, pools or spas)
- Severance fee
- $50
- Severance bond
- None listed
- Colorado bond
- None listed
- Insurance
- Proof required
Steps to work as a solar installer in Severance
- 1
Get the Colorado Photovoltaic Installer registration (or Electrical Contractor registration)
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.34
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
- 2
- 3
Apply for your Severance license
$50Class B2 limited residential contractor license (solar, pools or spas): $50 license.1 Bring the bond and insurance certificate.
- 4
Pull a permit for each job
Over-the-counter permits are not issued, and permits do not go to plan review, without a town contractor license.2
Severance license details
Class B2 limited residential contractor license (solar, pools or spas) Solar installerPool and spa contractor Fee$50 Bond—
Who needs it
Contractors installing solar (the application must include a master electrician) or pools or spas.1
What you need
Passing an ICC exam, or a current license from another jurisdiction that requires ICC testing.1
Insurance
Renewal
Valid for three years: the year of application and two years after.1
Colorado rules in short
State license
Photovoltaic Installer registration (or Electrical Contractor registration). Full Colorado requirements
Job size limit
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.34
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
Hiring a solar installer in Severance?
What to ask for
A current Colorado Photovoltaic Installer registration (or Electrical Contractor registration), the Severance Class B2 limited residential contractor license (solar, pools or spas), and a certificate of insurance.
Doing the work yourself
Homeowners generally do not need a contractor license, unless they do work at more than one residence in a given year.2
Sources
5 official pages, checked November 10, 2026
- Contractor License Application · Town of Severance · checked 2026-11-10
- Contractor Licensing · Town of Severance · checked 2026-11-10
- SB25-165 Licensure of Electricians · Colorado General Assembly · checked 2026-11-06
- Colorado Revised Statutes 2024, Title 12: Professions and Occupations (uncertified printout) · Colorado General Assembly, Office of Legislative Legal Services · checked 2026-11-06
- 3 CCR 710-1 State Electrical Board Rules and Regulations (version effective 09/22/2026) · Colorado Secretary of State, Code of Colorado Regulations (Department of Regulatory Agencies, State Electrical Board) · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research