Solar installer · Monument, CO
Solar installer license requirements in Monument, Colorado
Everything a solar installer needs to work legally in Monument: the Colorado state rule and the local license. Checked November 6, 2026 from 12 official sources.
What does a solar installer need to work in Monument?
You need two licenses: one from Colorado and one from Monument.
Colorado state license · required
Photovoltaic Installer registration (or Electrical Contractor registration)
Monument license · required
Building Contractor F (Solar Energy)
- Monument fee
- $50
- Monument bond
- None listed
- Colorado bond
- None listed
- Insurance
- Proof required
Steps to work as a solar installer in Monument
- 1
Get the Colorado Photovoltaic Installer registration (or Electrical Contractor registration)
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.67
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
- 2
Get a certificate of insurance
General liability of at least $1,000,000 per occurrence and $2,000,000 aggregate, with PPRBD as certificate holder.3
More
Workers' compensation if the business has employees, or a state Rejection of Coverage form if it has none.
- 3
Apply for your Monument license
$50Building Contractor F (Solar Energy): $50 application fee, new license (nonrefundable).2 Bring the bond and insurance certificate.
- 4
Monument license details
Building Contractor F (Solar Energy) Solar installer Fee$50 Bond—
Who needs it
Installing active solar heating and cooling systems and connecting them to existing gas, plumbing and heating systems.1
Fees and bond
Insurance
General liability of at least $1,000,000 per occurrence and $2,000,000 aggregate, with PPRBD as certificate holder.3
More
Workers' compensation if the business has employees, or a state Rejection of Coverage form if it has none.
Renewal
All businesses operating in the Town of Monument, including contractors, need a town business license from the Town Clerk.1012
More
Contractors file the Business License Application but not the Business Premise Form. Applications and renewals go through the town's Caselle portal; the page does not list fees. Contractor accounts in the town permit system are validated against the business license before permits can be applied for.
Colorado rules in short
State license
Photovoltaic Installer registration (or Electrical Contractor registration). Full Colorado requirements
Job size limit
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.67
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
Hiring a solar installer in Monument?
What to ask for
A current Colorado Photovoltaic Installer registration (or Electrical Contractor registration), the Monument Building Contractor F (Solar Energy), and a certificate of insurance.
Doing the work yourself
A homeowner may get a permit only to do the work themselves on the primary residence they own and live in, not on a rental or a home they do not live in.11
More
It is illegal for a homeowner to get a permit for a contractor hired to do the work. A single-member LLC or an asset-holding trust may be considered for a homeowner permit with supporting documents.
Sources
12 official pages, checked November 6, 2026
- License Types · Pikes Peak Regional Building Department · checked 2026-11-06
- 2023 Pikes Peak Regional Building Code, 2nd Printing (Table RBC202.6, License and Registration Fees) · Pikes Peak Regional Building Department · checked 2026-11-06
- Insurance Requirements for Contractors · Pikes Peak Regional Building Department · checked 2026-11-06
- About Us · Pikes Peak Regional Building Department · checked 2026-11-06
- Licensing FAQ · Pikes Peak Regional Building Department · checked 2026-11-06
- SB25-165 Licensure of Electricians · Colorado General Assembly · checked 2026-11-06
- Colorado Revised Statutes 2024, Title 12: Professions and Occupations (uncertified printout) · Colorado General Assembly, Office of Legislative Legal Services · checked 2026-11-06
- 3 CCR 710-1 State Electrical Board Rules and Regulations (version effective 09/22/2026) · Colorado Secretary of State, Code of Colorado Regulations (Department of Regulatory Agencies, State Electrical Board) · checked 2026-11-06
- Permits · Town of Monument · checked 2026-11-06
- Permitting with the Town of Monument · Town of Monument · checked 2026-11-06
- The Homeowner Process · Pikes Peak Regional Building Department · checked 2026-11-06
- Business Licenses · Town of Monument · checked 2026-11-06
Rules change. Confirm with the agency before you bid or start work. How we research