licenserules

Demolition contractor · Fort Collins, CO

Demolition contractor license requirements in Fort Collins, Colorado

Everything a demolition contractor needs to work legally in Fort Collins: the Colorado state rule and the local license. Checked November 6, 2026 from 3 official sources.

What does a demolition contractor need to work in Fort Collins?

You need one license, from Fort Collins. Colorado has no state license for this trade.

1

Fort Collins license · required

Specialized Trade Contractor license

Fort Collins fee
$300
Fort Collins bond
None listed
Colorado bond
None listed
Insurance
Proof required

Steps to work as a demolition contractor in Fort Collins

  1. 1

    Get a certificate of insurance

    General liability with a $2,000,000 general aggregate, with the City of Fort Collins as certificate holder.1

  2. 2

    Apply for your Fort Collins license

    $300

    Specialized Trade Contractor license: $300 new or reinstated license and supervisor certificate.1 Bring the bond and insurance certificate.

    What the application needs

  3. 3

    Pull a permit for each job

    Paid workers who supervise a whole project must be city-licensed general contractors.23

    More

    Paid structural wood framing, roofing, electrical, plumbing and HVAC work must be done by city-licensed subcontractors, who must be listed on the permit application.

    Open the permit portal

Fort Collins license details

Specialized Trade Contractor license RooferHVAC contractorSolar installerDemolition contractor Fee$300 Bond—

Who needs it

Contractors in specialized trades: awnings, demolition (full razes), fire alarm, fire sprinkler, fireplace appliances, flammable fuel facilities, gas piping, HVAC (residential, commercial, and repair and replacement), refrigeration, roofing, signs, solar water and solar PV systems (wiring 50 volts or less only), framing, and wireless telecommunication systems.1

What you need

  • Exams by trade: ICC G29 for HVAC and refrigeration, ICC G33 for gas piping, ICC G14 (also listed as F14) for roofing, F46 for framing, NABCEP certification for solar, NICET II or equal for fire alarm.1

    More

    Awnings, demolition, fireplace, fire sprinkler, signs, flammable fuel facilities and wireless telecommunication need no exam.

  • Most trades need three verifications of completed projects. Roofing covers roofs above 2:12 pitch; Roofing(+) also covers flat and low-slope roofs and needs verifications of roofs at 2:12 or less.1

Fees and bond

New or reinstated license and supervisor certificate1$300
Renewal of license and supervisor certificate1$225

Insurance

General liability with a $2,000,000 general aggregate, with the City of Fort Collins as certificate holder.1

Renewal

Renew with the renewal packet, an updated insurance certificate and the renewal fee.1

Apply on the official site
Business license

All contractors doing business in Fort Collins must get a city business license in addition to any contractor license, and must meet the city's contractor sales and use tax requirements before starting a project.1

Hiring a demolition contractor in Fort Collins?

What to ask for

the Fort Collins Specialized Trade Contractor license, and a certificate of insurance.

Check a Colorado license

Doing the work yourself

Owners of a detached single-family home may do the work or act as their own general contractor on their primary residence by signing a notarized Homeowner Affidavit.2

More

An owner building a new home must live in it and may not have built another new home in the city in the past 24 months. Owners of attached homes (townhouse, condo, duplex) may only do minor repairs: no structural, fire-rated, electrical, plumbing or mechanical work, no more than 100 sq ft of roofing, and no nonstructural work over $2,000.

Sources

3 official pages, checked November 6, 2026
  1. Contractor Licensing · City of Fort Collins · checked 2026-11-06
  2. Homeowner Affidavit (revised 07/23/2025) · City of Fort Collins Building Services · checked 2026-11-06
  3. Building Permits · City of Fort Collins · checked 2026-11-06

Rules change. Confirm with the agency before you bid or start work. How we research