Solar installer · Berthoud, CO
Solar installer license requirements in Berthoud, Colorado
Everything a solar installer needs to work legally in Berthoud: the Colorado state rule and the local license. Checked November 7, 2026 from 6 official sources.
What does a solar installer need to work in Berthoud?
You need two licenses: one from Colorado and one from Berthoud.
Colorado state license · required
Photovoltaic Installer registration (or Electrical Contractor registration)
Berthoud license · required
Trade Contractor license
- Berthoud fee
- $100
- Berthoud bond
- None listed
- Colorado bond
- None listed
- Insurance
- Proof required
Steps to work as a solar installer in Berthoud
- 1
Get the Colorado Photovoltaic Installer registration (or Electrical Contractor registration)
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.34
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
- 2
Get a certificate of insurance
General liability of at least $300,000 combined single limit per occurrence, with the Town of Berthoud as certificate holder (10 days' notice for non-payment, 30 days for other cancellation). The license is revoked if the insurance is revoked.2
- 3
Apply for your Berthoud license
$100Trade Contractor license: $100 license (one year), except electrical and plumbing.1 Bring the bond and insurance certificate.
- 4
Pull a permit for each job
Contractors must be licensed with the Town before applying for a permit.1
More
Permits are submitted through CommunityCore. Get the permit before buying materials and show it to the supplier to avoid paying use tax twice.
Berthoud license details
Trade Contractor license RooferHVAC contractorPlumberElectricianSolar installer Fee$100 Bond—
Who needs it
What you need
Sign the Town's Acknowledgement Memorandum.1
Fees and bond
Insurance
General liability of at least $300,000 combined single limit per occurrence, with the Town of Berthoud as certificate holder (10 days' notice for non-payment, 30 days for other cancellation). The license is revoked if the insurance is revoked.2
Renewal
Colorado rules in short
State license
Photovoltaic Installer registration (or Electrical Contractor registration). Full Colorado requirements
Job size limit
Under SB25-165, the State Electrical Board regulates photovoltaic electrical work for systems under 300 kilowatts, and only an electrical contractor or a registered photovoltaic installer may do or offer that work.34
More
Photovoltaic electrical work on systems of 300 kilowatts or more must be done by licensed electricians or supervised apprentices.
Hiring a solar installer in Berthoud?
What to ask for
A current Colorado Photovoltaic Installer registration (or Electrical Contractor registration), the Berthoud Trade Contractor license, and a certificate of insurance.
Sources
6 official pages, checked November 7, 2026
- Building Department · Town of Berthoud, Colorado · checked 2026-11-07
- Ordinance No. 1376 (Series 2026), contractor licensing · Town of Berthoud, Colorado · checked 2026-11-07
- SB25-165 Licensure of Electricians · Colorado General Assembly · checked 2026-11-06
- Colorado Revised Statutes 2024, Title 12: Professions and Occupations (uncertified printout) · Colorado General Assembly, Office of Legislative Legal Services · checked 2026-11-06
- 3 CCR 710-1 State Electrical Board Rules and Regulations (version effective 09/22/2026) · Colorado Secretary of State, Code of Colorado Regulations (Department of Regulatory Agencies, State Electrical Board) · checked 2026-11-06
- Business License · Town of Berthoud, Colorado · checked 2026-11-07
Rules change. Confirm with the agency before you bid or start work. How we research